阳泉市上社煤炭有限责任公司一盘区8#煤层开采初步设计(任务书,设计说明书31000字,CAD图纸4张)
摘 要
本次设计是阳泉上社煤炭有限公司一盘区8#煤层,说明书共八章。根据采矿工程的需要和特点,重点设计为第二、三章,其他如井底车场、采区车场及硐室施工设计仅做一般的选型计算。
阳泉市上社煤炭有限责任公司井田位于阳泉市盂县南娄镇北上社村南,县城西南12km,地处沁水煤田北部,地理坐标为北纬37°58′44″~38°00′45″,东经113°16′57″~113°21°09″。该井田东西长5.5km,南北宽3km,面积12.6854km2。
盂-寿公路由井田的北界通过,并与阳-盂公路相连接,可承担本矿井煤炭外运任务,另外,本矿南距石-太铁路阳泉站40km,亦可经铁路将煤炭运往全国各地。煤炭交通外运条件好。
矿井采用主斜副立开拓方式,回采工艺采用综采,采煤方法采用倾斜长壁采煤法,采用“四六制”作业制度。工作面的设备有双端可调双滚筒采煤机、液压支架、可弯曲刮板运输机、破碎机、转载机等。顶板管理采用液压支架,采空区处理采用全部跨落法。矿井绝对瓦斯涌出量为30m3/min,相对瓦斯涌出量为5.9m3/t,CO2绝对涌出量为0.91m3/min,相对涌出量为1.80m3/t,属低瓦斯矿井。 [版权所有:http://think58.com]
井田煤层产状基本是一东—西走向,向南倾伏的单斜构造,局部略有起伏,井田内地层比较平缓,倾角一般3~5°,局部可达14°。井田内尚未发现有断层、陷落柱分布。井田构造属简单。本井田划分为3个盘区,本次设计为一盘区。一盘区可采煤层主要为8#煤层。
8#号煤原煤灰分较低,硫分也较低。经洗选后,灰分均有较大幅度降低。经在附近煤矿采样试验,8#煤层均属于中等可选。本矿井设计一盘区的设计生产能力是120万吨,采用一套综采设备来满足产量的要求。
该采区运输大巷采用皮带运输作为主运输,采用无极绳绞车作为辅助运输。采区通风采用轴流式扇风机、抽出式通风,通风方式为中央并列式。
关键词:低瓦斯;主斜副立开拓; 一盘区;综采;长壁采煤法。
Abstract
This design is the Yangquan Club coal limited an area 8# coal seam, manual chapter eight. According to the needs and the characteristics of mining engineering, focusing on the design for the second, three chapters, such as the bottom, the mining yard and chamber construction design only do general selection calculation.
Yangquan city agency coal Ida limited liability company is located in Yangquan City, South Yuxian Lou Town North Village South, southwest of the city of 12km, located north of Qinshui coalfield, the geographic coordinates of latitude 37 ° 58 '44 "~ 38 ° 00 ′ 45 ″, longitude 113 ° 16' 57" ~ 113 ° 21 ° 09 ". The Ida Tonishinaga 5.5km, north-south width of 3km, area 12.6854km2. [资料来源:THINK58.com]
Through the north boundary of Yu - Shou Gong routing Ida, and connected with the Yang - Yu Road, can undertake the task of mine coal Sinotrans, in addition, the mine south from the stone - so the YangQuan Railway Station 40km, also by the railway coal to be transported across the country. Sinotrans coal traffic conditions.
The main inclined mine auxiliary vertical development, fully mechanized mining method by mining technology, inclined long wall mining method, using the "four six system" operating system. Equipment working face with two end adjustable double drum shearer, hydraulic support, can be bent scraper conveyor, crusher, transfer machine. Roof management adopts hydraulic support, mined-out area treatment using all across france. The absolute gas emission rate is 30m3\/min, the relative gas emission rate of 5.9m3\/t, CO2 absolute emission amount is 0.91m3\/min, the relative emission for 1.80m3\/t, and belongs to the low gas mine.
Ida coal seam occurrence is basically a East - West, South monoclinic structure plunging, local slightly undulating, flat dip layer Ida mainland, generally 3 ~ 5 °, 14 ° local accessibility. Ida Chinaomi found fault, subsided column distribution. The structure is simple. Honi Da is divided into 3 zones, the design for a disc area. A region of coal seam is mainly 8# coal seam.
No. 8# coal raw coal ash low sulfur, low. After washing, can greatly reduce the ash. The sampling test in the vicinity of coal, 8# coal seam belongs to medium optional. The design of mine a panel design production capacity is 1200000 tons, with a set of fully mechanized equipment to meet production requirements.
The mine transportation roadway with belt transport as the main transport, the endless rope winch is used as auxiliary transport. Mine ventilation by axial flow fan, exhaust ventilation, ventilation for the central paratactic type.
Keywords: low gas; the main diagonal pair of vertical development; a panel; fully mechanized longwall mining method
图纸:
(1)、采区平剖面图;
(2)、回采工作面图;
(3)、矿井通风立体示意图;
(4)、矿井巷道断面图册;
[来源:http://think58.com]
目 录
摘 要 ii
Abstract iii
第一章 井田概述和井田地质特征 1
第一节 矿区概述 1
一、矿井概况 1
二、矿区地质情况 1
三、井田开拓 2
第二节 采区地质特征 5
一、采区地质概况 5
二、采区煤层及顶底板特征 6
三、采区水文地质概况 8
四、可采储量 11
第三节 采区生产能力及服务年限 11
一、采区生产能力 11
二、采区服务年限 12
第四节 采煤方法及采区参数 13
一、采煤方法的选择 13
二、采区参数的确定 13
第二章 采区巷道布置 15
第一节 采区巷道布置方案初选分析 15
一、采煤方法的选择应遵循下列原则 15
二、巷道布置 15
第二节 确定采区巷道布置的可行方案和比较 16
一、采区上山位置、数目方案提出,比较和确定 16
二、两个采(盘)区巷道布置方案 17
第三节 采区准备工作 19
一、开采顺序 19
二、采区准备及组织 19
三、工作面接替 22
四、采区准备及组织 22
第三章 回采工艺设计 23
第一节 设计工作面的地质概况 23
第二节 回采工艺方式的选择 23
一、采煤方法 23
二、工作面设备选型 23
第三节 落煤与装煤 24
一、采煤机落煤与装煤 24
二、采煤机选型 24
第四节 运煤 25
第五节 工作面顶板管理 25
一、回采工作面支护形式: 26 [资料来源:http://think58.com]
二、回柱放顶 27
三、对拉工作面的错距 27
第六节 采空区处理 27
一、回柱放顶的安全技术措施 27
二.强制放顶的方法 28
第七节 回采工作面生产技术管理 29
第四章 采区车场及硐室施工设计 31
第五章 采区生产系统及机电设备选型 32
第一节 采区运输 32
一、采煤工作面主要运输系统 32
二、掘进工作面主要运输系统 32
第二节 采区供电 33
一、供电设计概况 33
二、南大巷采区供电 33
三、8#采区供电 33
四、东大巷采区供电 34
五.三专两闭锁 34
第三节 采区供排水 34
一、供水系统 35
二、排水系统 36
第六章 采区通风与安全 37
[版权所有:http://think58.com]
第一节 风量的计算 37
第二节 矿井通风系统和风量分配 40
一、矿井通风系统 40
二、风量分配 41
三、分配的方法 41
第三节 计算负压及等积孔 41
一、计算原则 41
二.计算方法 42
第四节 选扇风机 43
第七章 安全技术措施 45
第一节 预防瓦斯和煤尘爆炸 45
第二节 防止水患 46
第三节 防止火灾 46
第四节 冒顶片帮事故的预防 46
第五节 其他灾害的预防 47
一、井下防尘 47
二、运输事故的防治 47
三、避灾线路 48
四、有毒、有害气体的防治 48
五、噪声防治 48
六、矿井集中安全监测监控 49 [资料来源:http://think58.com]
第八章 采区技术经济指标 50
参考文献 52
致 谢 53