某60+100+60m连续梁桥施工过程内力分析(含CAD图,Midas模型)
1.无需注册登录,支付后按照提示操作即可获取该资料.
2.资料以网页介绍的为准,下载后不会有水印.资料仅供学习参考之用.
密 惠 保
某60+100+60m连续梁桥施工过程内力分析(含CAD图,Midas模型)(任务书,开题报告,外文翻译,论文说明书22000字,CAD图13张,,Midas模型)
摘要 随着时代的发展,现代化步伐的加快,我国的交通事业也在日新月异地发展着,因此需要修建跨越江河海峡的大跨度桥梁也越来越多,而且桥梁跨越度越大,导致其施工难度也越大。所以预应力混凝土连续梁桥就凭借其优越的结构体系成为当今一种被广泛采用的桥梁形式。它结构刚度强、整体性好、不易变形、抗震性能好,特别是桥面伸缩缝少,主梁变形平缓,行车比较舒适等。一般在大跨度预应力混凝土连续梁桥施工过程中,主要采用悬臂浇筑法进行施工,因此桥梁结构会在施工期间产生复杂的位移与内力变化,为了保证施工的安全与质量,必须对施工过程中的桥梁结构进行内力分析,正确的模拟既能在理论上分析桥梁施工阶段的内力状况,又能给工程设计与施工提供有效的参考。
本论文研究对象是预应力混凝土连续梁桥,其孔径布置为60+100+60m,全长为221.5m,主梁采用变高度变截面的单箱单室箱型截面,施工方法采用对称悬臂施工法。通过利用Midas软件分析,考虑施工过程体系转换和混凝土收缩徐变因素进行恒载内力分析,分析施工阶段各控制截面的内力,研究其位移、剪力和弯矩的变化。最后,对该桥进行钢束的拉应力分析和结构内力分析。 [资料来源:http://think58.com]
关键词:连续梁;Midas 建模;挂篮施工;内力分析
Abstract
As the time goes by, and accelerated the pace of the development of the modernization, development of our country’s transportation change rapidly , therefore there are across rivers and Straits of long-span bridges need to be built is becoming more and more, and as span degree become larger, the difficulty of construction is increase. So the prestressed concrete continuous beam bridge with its superior architecture has become a widely used type of bridge. Its structure is strong, the entirety is good, not easy deformation, seismic performance is good, especially the bridge expansion joints, main girder deformation is gentle, driving more comfortable. In large span pre stress concrete continuous beam bridge construction process, the majority of the cantilever pouring construction And bridge structure during construction will produce complex displacement and internal force change, in order to ensure the quality and safety of construction must be internal force analysis of the bridge, the correctness of the simulation can in theory analysis of internal force of bridge construction stage, but also to provide effective reference for engineering design and construction.
[来源:http://think58.com]
The research object of this thesis is a prestressed concrete continuous bridge, the aperture arrangement for 60+100+60m, full-length for 221.5m, girder with variable height variable cross-section single box single room box type section, construction method using symmetrical cantilever construction method. Using the Midas software analysis considering construction process system conversion and shrinkage and creep of concrete factors of dead load internal force analysis, the internal force analysis of the construction phase of the control section, and to study the change of displacement, shear force and bending moment . Finally, on the bridge were steel beam tensile force analysis and structural internal force analysis.
Key words: continuous beam; Midas modeling; hanging basket construction; analysis of internal force
摘要 3
第1章 绪论 1
1.1预应力混凝土连续梁桥概述 1
1.2预应力混凝土连续梁桥的主要施工方法 1
1.3.2体系转换施工过程 3
1.3.3体系转换对桥梁结构的影响和作用 4
1.4本文的研究内容和研究方法 5
第2章 Midas 建模步骤 6
前言 MIDAS CIVIL软件简介 6
2.1 设定操作环境 7
2.2定义材料 7
2.3定义截面 7
2.4 节点单元建立 10
2.4.2 扩展生成单元 10
2.4.3 修改节点坐标 11
2.4.4 修改截面 11
2.4.5设置变截面组 12
2.5 修改单元依存材料特性 13
2.6 修改截面有效宽度 13
2.7 结构组、边界组、荷载组的定义 13
2.7.1结构组的定义 13
2.7.2边界组的定义 14
[资料来源:http://THINK58.com]
2.7.3 荷载组定义 15
2.8 荷载工况定义及荷载输入 15
2.8.1 静力荷载工况定义 15
2.8.2移动荷载工况的定义 17
2.8.3 预应力荷载及预应力钢束输入 17
第3章 Midas 施工过程的建立与荷载组合 19
3.1施工阶段的定义 19
3.2生成荷载组合 20
第4章 模型结果查验 23
4.1使用阶段自重作用下的结构内力查看 23
4.2 施工阶段法向压应力的验算 24
4.3 预应力钢筋中的拉应力验算 24
4.4 施工过程中预应力钢束的应力损失 24
第5章 悬臂施工阶段内力分析 30
5.1 悬臂施工内力分析 30
5.1.1 A1悬臂块的内力分析 30
5.1.2 A12悬臂块的内力分析 31
5.2 边跨合拢施工段内力分析 33
5.3 中跨合拢施工段内力分析 34
第6章 施工阶段的内力监控 36
6.1施工阶段的监控的意义 36
6.2施工阶段监控的目的与目标 36
6.3施工阶段监控的主要内容 36
第7章 结论与展望 38
附表 39
附表1 施工阶段法向压应力的验算 39
参考文献 60
致谢 61 [来源:http://www.think58.com]
上一篇:(40+58+40)m预应力混凝土变截面连续箱梁桥施工图设计(含CAD图)